A current transformer manufacturer designs and builds CTs that scale high line current to a safe, measurable secondary value. When a project needs a ratio outside the catalog, a custom current transformer manufacturer must turn that request into turns, core size, accuracy and burden calculations. This guide shows how that process works in 2026, what data buyers should supply, and which checks separate a sound special-ratio CT from a risky one. It is written for U.S. engineers, panel builders and utility buyers.

What counts as a special ratio request?

A special ratio request is any order for a current transformer ratio outside the preferred catalog values, or a standard ratio paired with unusual accuracy, burden or mounting demands. A seasoned current transformer manufacturer treats these orders as engineering projects, not stock picks, because every ratio change ripples through the core, the winding and the test plan.

A custom current transformer manufacturer is a company that designs CTs around a buyer's exact ratio, accuracy, burden and mechanical needs rather than selling only catalog models. The scope covers core material, secondary turns, the insulation system and the test plan. Many such firms are also an instrument transformer manufacturer, supplying voltage transformers next to CTs, and some operate as a broader electrical transformer manufacturer.

At its core, a current transformer works by magnetic induction. The primary conductor passes through or around a core, and the secondary winding delivers a proportionally smaller current. The current transformer ratio is therefore set by turns and geometry, so changing it means changing taps, windings or both.

Standard versus non-standard ratios

An ANSI IEEE C57.13 current transformer with a 5 A secondary lists preferred ratios such as 50:5, 100:5, 200:5, 600:5, 1200:5, 2000:5 and 3000:5. Anything off that list, such as 175:5, 2500:5 or a 1 A secondary, normally triggers a design review. The 5 A secondary dominates U.S. utility and industrial work, while 1 A secondaries appear mainly where relay leads are long. Of course, some "special" ratios turn out to be standard ratios in disguise, and an honest current transformer supplier will say so before quoting new tooling.

Why do buyers ask for special ratios?

Buyers ask because real load, protection and metering needs rarely land on preferred values. Retrofit work shows three recurring drivers:

  • Right-sizing for light load, so a metering current transformer stays inside its accuracy range.
  • Matching existing relay settings or meter multipliers.
  • Leaving room for load growth through a multi-ratio design.

Why do so many projects stumble here? Usually the ratio was picked from the breaker rating instead of the actual load and fault duty. Whichever route a project takes, the current transformer manufacturer owns the calculation and the buyer owns the data. Weak data produces weak designs.

How a custom current transformer manufacturer reviews the request

A custom current transformer manufacturer starts with structured data intake, then runs feasibility checks before issuing any quote. No reliable current transformer supplier prices a special ratio from the ratio alone.

Data a current transformer supplier needs

Incomplete inquiries cause most delays. Engineers typically ask for the following:

  • Primary current, maximum continuous load and required rating factor
  • Secondary rating, 5 A or 1 A
  • System voltage, basic insulation level (BIL) and frequency
  • Available short-circuit current and its duration
  • Accuracy class, burden in VA or ohms, and lead length
  • Mounting style, clearances and installation environment

Missing lead length is the classic oversight. A 5 A secondary run of 100 ft one way in 12 AWG copper (about 1.59 Ω per 1,000 ft) adds roughly 0.32 Ω of round-trip resistance. That alone exceeds a 0.2 Ω (B-0.2) metering burden before the meter is even connected.

Step-by-step engineering review

Based on common factory practice, the review of a special ratio follows this sequence:

  1. Confirm the requested ratio against load, rating factor and short-circuit data.
  2. Check whether a standard or multi-ratio design can already cover the need.
  3. Calculate core cross-section and secondary turns for the required accuracy class and burden.
  4. Verify saturation margin plus thermal and dynamic withstand.
  5. Confirm insulation level and physical fit with the switchgear, bushing or busbar.
  6. Issue a drawing and test plan for the buyer to approve.

Sometimes step 2 ends the project. A catalog multi-ratio unit may already satisfy the buyer at lower cost, and a good current transformer manufacturer will recommend it.

Why do some quotes take longer than others? Typically because step 4 sends the design back to step 3. A ratio that looks simple on paper can demand a larger core once the saturation check is run, and a larger core changes the outline drawing.

Engineering methods for building a special current transformer ratio

Manufacturers deliver special ratios in three main ways: tapped secondary windings, reconnectable primary windings, or a new turns count on a purpose-built core. The choice depends on voltage class, accuracy target and budget.

Secondary taps and multi-ratio designs

Tapped secondaries are the most flexible option for a current transformer for switchgear. A typical 600:5 multi-ratio unit offers ten ratios from one core, as shown below. The arrangement follows the common five-terminal layout used in ANSI practice; always confirm terminals against the actual nameplate.

Secondary terminalsRatioShare of full winding
X2–X350:58.3%
X1–X2100:516.7%
X1–X3150:525.0%
X4–X5200:533.3%
X3–X4250:541.7%
X2–X4300:550.0%
X1–X4400:566.7%
X3–X5450:575.0%
X2–X5500:583.3%
X1–X5600:5100.0%

Lower taps use fewer secondary turns, so the available excitation voltage falls in proportion. Accuracy and saturation limits shrink with it, and the published class usually applies to the full winding only. Engineers frequently size relays on a low tap, then discover the CT saturates under fault current. Ask your current transformer manufacturer for per-tap performance data.

Primary reconnection and turns adjustment

In a high voltage current transformer, series-parallel primary reconnection often doubles the ratio range with one active part, for example 300:5 versus 600:5. A bar type current transformer has a single primary turn, so ratio changes come only from the secondary. A wound-primary design can add primary turns to lift accuracy at low currents, though it costs more and takes more space. A ratio below the lowest practical primary rating may require exactly that.

Can any ratio be built?

Nearly any ratio can be built, but not every ratio can be built to every accuracy class. Secondary turns are whole numbers, so a ratio requiring fractional turns is approximated, and the resulting turns-ratio error must be compensated or accepted. The current transformer basics tutorial explains why turns count is tied so closely to ratio. A responsible manufacturer states any compromise in writing.

Balancing special ratios with accuracy class and burden

A special ratio is acceptable only if the current transformer accuracy class still holds at the real burden and current range. Ratio, class and burden form one design triangle, and pulling one corner forces trade-offs in the others.

Think of the core as a bucket of magnetic flux. Burden drains the bucket, and a smaller ratio means a smaller bucket. The manufacturer's job is to make sure it never runs dry at the currents that matter.

Metering current transformer limits

A metering current transformer is specified by class 0.3, 0.6 or 1.2 at standard burdens. IEEE C57.13 expresses the limits as a transformer correction factor (TCF) at 100% and 10% of rated current.

Metering accuracy classTCF limits at 100% rated currentTCF limits at 10% rated currentTypical use
0.30.997–1.0030.994–1.006Revenue metering
0.60.994–1.0060.988–1.012General metering
1.20.988–1.0120.976–1.024Indicating instruments

Standard metering burdens at 5 A are B-0.1 (2.5 VA), B-0.2 (5 VA), B-0.5 (12.5 VA), B-0.9 (22.5 VA) and B-1.8 (45 VA). Class limits apply only at or below the rated burden.

Paraphrased from the accuracy provisions of IEEE Std C57.13: a CT's stated accuracy is guaranteed only within its rated burden and current range. Outside that envelope, performance is not assured.

Protection class current transformer saturation check

A protection class current transformer carries a relaying class such as C100, C200, C400 or C800. The number is the secondary terminal voltage the CT can deliver at 20 times rated current with no more than 10% ratio error, using standard burdens B-1, B-2, B-4 and B-8 Ω.

Here is illustrative arithmetic, not a design recommendation. Take a 600:5 CT with a 12,000 A symmetrical fault. Secondary current is 12,000 ÷ 120 = 100 A. With 0.6 Ω total burden, the secondary voltage is 60 V. A C100 rating offers 100 V, a margin of about 1.67 before DC offset. With a high X/R ratio, offset can multiply flux demand well beyond that, so a manufacturer may propose C200 or a larger core. A competent manufacturer repeats this calculation for every tap and every core.

Matching the ratio to the right CT construction

The ratio you need often dictates the construction, because conductor size, available space and voltage class decide whether a window, bar, split core or wound design is practical.

Split core, window type and bar type options

A window type current transformer slips over a cable or busbar and uses one primary turn, so ratio is set entirely by secondary turns. A bar type current transformer has a built-in primary conductor and handles higher thermal and dynamic stress. A split core current transformer opens for installation without disconnecting the conductor, which suits metering upgrades. Wound-primary units suit very low ratios such as 5:5 or 20:5, where a single turn would be too inaccurate.

Is a split core CT as accurate as a solid core unit?

Generally not. The joint gap in a split core current transformer adds magnetizing current, so achievable accuracy classes are often looser than for solid-core units. Many split core products serve monitoring and sub-metering well, but revenue-grade work usually calls for a solid-core design. Check the manufacturer's stated class before assuming otherwise.

High voltage current transformer and switchgear applications

In medium-voltage switchgear, space is the constraint. In a high voltage current transformer, insulation and partial-discharge performance take over. Oil-immersed or gas-insulated units often carry several secondary cores, one for metering and others for protection, and buyers commonly request a different ratio on each core. Buyers searching for a CT manufacturer USA sometimes evaluate overseas plants too. The questions stay the same: standard conformity, test evidence and support.

Testing, documentation and quality control for custom ratios

Every custom ratio should be proven by routine tests on each unit, backed by design-level evidence and a clear document package. Verification is what turns a calculation into a trustworthy product.

Routine and special tests

Routine tests typically cover polarity, ratio and phase-angle accuracy at rated burden, insulation resistance, applied-voltage withstand and secondary excitation curves for protection cores. Higher voltage classes add partial-discharge measurement. Special tests, such as temperature rise, short-time current and lightning impulse, are usually performed on a design basis and may be requested separately.

Facilities matter here. SANDIAN, a Hunan-based current transformer manufacturer producing 24–500 kV instrument transformers, reports two fully enclosed purification workshops with automated vacuum oil filling and six vacuum drying systems. It also lists 550 kV and 1500 kV partial-discharge-free power-frequency test equipment and a 3000 kV impulse voltage test installation. Its ISO 9001, ISO 14001 and OHSAS 18001 management-system certificates are useful context, though they do not replace product test reports.

What documents should accompany a custom ratio?

At minimum, request a nameplate listing every tap and terminal, a test report with measured ratio and phase angle, excitation curves for protection cores, an outline drawing and a statement of the standard applied. Confirm these before shipment, not after the unit arrives. Reviewing them also protects the people who commission the equipment.

One safety point is universal: never leave an energized CT secondary open-circuited, because dangerous voltages can develop. Short the secondary before disconnecting any burden, and have qualified personnel perform the work.

Illustrative cases and how to choose a custom current transformer manufacturer

Choose a supplier that can show a written engineering review, in-house test capability and traceable documentation. The two scenarios below are hypothetical composites for explanation. They are not named client projects or measured results.

Case A: metering retrofit on a lightly loaded feeder

A 1,200 A switchgear bay normally carries about 150 A, and the original plan specifies 1200:5. At 150 A, the CT works at 12.5% of its rating, close to the 10% point where class tolerances widen. The manufacturer proposes 300:5 with a 4.0 rating factor, giving 1,200 A continuous capacity while the normal load sits at 50% of nameplate. It then verifies the class at the stated burden. The exception: if the utility mandates a specific ratio for its revenue meter, that requirement wins.

Case B: dual-ratio high voltage CT with mixed duties

A substation expects load to roughly double. The buyer requests a high voltage current transformer with primary series-parallel reconnection giving 300:5 now and 600:5 later on the metering core, plus a separate protection core fixed at 600:5, class C400. The review checks that metering accuracy holds on both connections, that saturation margin is calculated at the highest fault level, and that the reconnection hardware withstands dynamic forces. The outcome is one nameplate listing both connections and a test report for each.

Capability checklist for choosing a supplier

  • A written engineering review that states any compromise on class or ratio
  • In-house high-voltage test capability, not only outsourced testing
  • A clear statement of which standard each unit is designed and tested to
  • Traceable documentation for every tap and core
  • Export and after-sales experience for overseas shipments

SANDIAN (Hunan Electric Power Insulator Electrical Co., Ltd.) manufactures CTs, voltage transformers, CVTs and combined transformers in the 24–500 kV range, exporting to more than 60 countries. As with any current transformer manufacturer, buyers should confirm directly which standards, ratios and ratings apply to their own project.

Conclusion

Special ratio requests succeed when buyers supply complete load, fault and burden data and when the manufacturer proves the design through calculation and testing. The right current transformer manufacturer will challenge an unnecessary custom ratio, explain trade-offs in accuracy and saturation, and document every tap. Start with the data checklist above, ask for written engineering feedback, and compare suppliers on test evidence rather than price alone.

Frequently asked questions

Q: What information does a current transformer manufacturer need to quote a special ratio?

A: Provide the primary and secondary current, system voltage and BIL, short-circuit current and duration, accuracy class, burden including lead length, and mounting details. Complete data lets the manufacturer check accuracy and saturation before quoting.

Q: Can a standard CT be rewired to a different ratio?

A: Only units built with secondary taps or a reconnectable primary can change ratio. Altering a sealed unit can void its test data and cause errors or hazards. Consult the manufacturer before any modification.

Q: Does a lower tap keep the same accuracy class?

A: Usually not. Lower taps use fewer secondary turns, which reduces saturation voltage and can degrade accuracy. The published class commonly applies to the full winding, so request per-tap performance data.

Q: How should I verify a custom CT before energizing it?

A: Compare the nameplate and test report against your specification, confirm polarity and tap connections, and make sure the secondary is shorted or connected to its burden. Have qualified personnel perform commissioning.

Inquire Now

Notice: Please leave your contact information, our professionals will contact you as soon as possible!

Submit Message

企业文化

以科技传承植物智慧,以责任守护健康未来


企业使命

食品更安全,生活更健康

今汉药业始终关注食品安全、天然健康与绿色可持续发展,致力于以植物功能成分和天然解决方案服务食品、营养健康、日化美妆、动物营养及宠物健康等领域,为客户创造更安全、更稳定、更具价值的产品选择。

企业愿景

汇今朝科技,扬汉方精粹

今汉药业坚持以现代科学技术挖掘植物资源价值,推动传统植物智慧与现代研发、绿色制造和产业应用深度融合,让来自东方的植物功能成分走向更广阔的全球市场。

企业发展方向

天然创新健康解决方案

围绕迷迭香、葫芦巴、桑叶等核心植物平台,今汉药业持续推进植物活性成分研究、提取纯化工艺升级和应用场景开发,为食品、营养健康、日化美妆、动物营养和宠物健康行业提供安全、高效、可持续的天然健康解决方案。

企业核心价值观

企业使命

食品更安全,生活更健康

今汉药业始终关注食品安全、天然健康与绿色可持续发展,致力于以植物功能成分和天然解决方案服务食品、营养健康、日化美妆、动物营养及宠物健康等领域,为客户创造更安全、更稳定、更具价值的产品选择。

企业愿景

汇今朝科技,扬汉方精粹

今汉药业坚持以现代科学技术挖掘植物资源价值,推动传统植物智慧与现代研发、绿色制造和产业应用深度融合,让来自东方的植物功能成分走向更广阔的全球市场。

企业发展方向

天然创新健康解决方案

围绕迷迭香、葫芦巴、桑叶等核心植物平台,今汉药业持续推进植物活性成分研究、提取纯化工艺升级和应用场景开发,为食品、营养健康、日化美妆、动物营养和宠物健康行业提供安全、高效、可持续的天然健康解决方案。

企业发展方向

天然创新健康解决方案

围绕迷迭香、葫芦巴、桑叶等核心植物平台,今汉药业持续推进植物活性成分研究、提取纯化工艺升级和应用场景开发,为食品、营养健康、日化美妆、动物营养和宠物健康行业提供安全、高效、可持续的天然健康解决方案。